Tuesday, January 13, 2026

Glodelania Railway final station

Glodelania Railway (2026) has officially reached its final station Penaldo. Thus last station will make way to Supreme Leader Nanobana Kinako's upcoming railway project called JR Minecraft Main Line, this railway line will use 4 tracks per station to support 2 types of services, local (stops at all stations) and express (skips some stations. This means the project requires 2 types of station. The first type of station has 2 platforms with 4 tracks between them, only local trains stops here while express trains skips it and usually has no access to the platform. The second type is another 2 platforms but with on 2 tracks between them and has 1 track to each end. Express trains stops here alongside local trains who usually drop and pick up passengers from the edge tracks. Unlike Supreme Leader Nanobana Kinako's previous railway project, the trains will drive at the left side of the railway line which means most of the time, the doors will be opening is on the left or right on the second type of station for local trains.

No comments:

Post a Comment

Note: only a member of this blog may post a comment.